Ferrovial
Farmers Branch, TX, USA
Who is NTE, NTE 35W, and LBJ? The North Tarrant Express (NTE) was the first design-build-finance-operate-maintain managed lanes project in Texas and consisted of the complete reconstruction of 13.3 miles of the existing I-820/SH-183 corridor between Dallas and Fort Worth. Since opening in October 2014, nine months ahead of the contracted completion date, the general highway lanes are experiencing a 70% decrease in congestion time and a 15% increase in average speed. This Cintra-led project has doubled capacity and significantly improved mobility along this heavily congested corridor that traverses the heart of six cities through Northeast Tarrant County. The North Tarrant Express 35W (NTE 35W) project spans 16.8 miles from I-30 in downtown Fort Worth to Eagle Parkway at the north end of Alliance Airport. The project is operated and maintained by the Cintra-led consortium in North Texas. This project has improved mobility by adding additional road capacity through a...